Overview
Efficient, safe and cost-effective execution from start to finish
On large infrastructure projects, hydraulic tools deliver a combination of power and precision that is hard to match.
On roads, bridges and ports, the safety and reliability of tools directly affect public safety, project timelines and the final result. With heavy machinery and complex engineering, reliable equipment keeps the job moving, reduces downtime and helps stay on budget.
Equipment safety also protects workers and the surrounding community: a failure can cause injuries, delays and costly damage.
Hydraulic tools provide the force and control needed to lift and place heavy structural elements, so projects can be executed efficiently, safely and cost-effectively from start to handover.
Featured projects
4 projects
Infrastructure / Power Team / Pumps
Bridge bearing replacement
- Situation
- Contractor Freyssinet, Inc. had to urgently replace a bridge's bearings with a synchronized lift scheduled just days out. Site access was limited, and a conventional synchronized system would have required specialized transport and long setup times.
- Solution
- Two eSync units were shipped on priority, with on-site technical support. The modular, portable components arrived in a pickup truck, were placed by hand and synchronized quickly, holding tolerances of 0.01" / 0.25 mm throughout the lift.
- Result
- The lift was completed in minutes, within tolerance, and significantly cut mobilization and setup time. The customer confirmed that a complex bridge lift no longer requires bulky systems or long lead times.

Infrastructure / Power Team / Cylinders
Bridge maintenance
- Situation
- During scheduled maintenance, a contractor needed high lifting force to raise a section of the deck and remove it.
- Solution
- Four Power Team R1006D cylinders and a motion control system to raise the deck with 1 mm precision.

Infrastructure / Power Team / Pumps
Bridge deck positioning
- Situation
- The customer needed to raise a bridge and keep it level and square while it was set in place to avoid structural damage.
- Solution
- Six RD10013 cylinders and a PE554S power unit to position the deck.

Infrastructure / Power Team / Cylinders
Form traveler system
- Situation
- A form traveler for cantilever construction of a concrete bridge had to be raised, aligned and locked before each pour, then lowered to advance to the next segment.
- Solution
- An R2806L cylinder with a lock collar as the main support, RH10010 cylinders for bar tensioning and custom cylinders for lowering.