Skip to main content

Industry

Infrastructure

Safe, reliable tools for road, bridge and port projects.

Overview

Efficient, safe and cost-effective execution from start to finish

On large infrastructure projects, hydraulic tools deliver a combination of power and precision that is hard to match.

On roads, bridges and ports, the safety and reliability of tools directly affect public safety, project timelines and the final result. With heavy machinery and complex engineering, reliable equipment keeps the job moving, reduces downtime and helps stay on budget.

Equipment safety also protects workers and the surrounding community: a failure can cause injuries, delays and costly damage.

Hydraulic tools provide the force and control needed to lift and place heavy structural elements, so projects can be executed efficiently, safely and cost-effectively from start to handover.

Featured projects

4 projects
  • Infrastructure / Power Team / Pumps

    Bridge bearing replacement

    Situation
    Contractor Freyssinet, Inc. had to urgently replace a bridge's bearings with a synchronized lift scheduled just days out. Site access was limited, and a conventional synchronized system would have required specialized transport and long setup times.
    Solution
    Two eSync units were shipped on priority, with on-site technical support. The modular, portable components arrived in a pickup truck, were placed by hand and synchronized quickly, holding tolerances of 0.01" / 0.25 mm throughout the lift.
    Result
    The lift was completed in minutes, within tolerance, and significantly cut mobilization and setup time. The customer confirmed that a complex bridge lift no longer requires bulky systems or long lead times.
  • Infrastructure / Power Team / Cylinders

    Bridge maintenance

    Situation
    During scheduled maintenance, a contractor needed high lifting force to raise a section of the deck and remove it.
    Solution
    Four Power Team R1006D cylinders and a motion control system to raise the deck with 1 mm precision.
  • Infrastructure / Power Team / Pumps

    Bridge deck positioning

    Situation
    The customer needed to raise a bridge and keep it level and square while it was set in place to avoid structural damage.
    Solution
    Six RD10013 cylinders and a PE554S power unit to position the deck.
  • Infrastructure / Power Team / Cylinders

    Form traveler system

    Situation
    A form traveler for cantilever construction of a concrete bridge had to be raised, aligned and locked before each pour, then lowered to advance to the next segment.
    Solution
    An R2806L cylinder with a lock collar as the main support, RH10010 cylinders for bar tensioning and custom cylinders for lowering.
Loading featured products